8 weeks away from the first race and having to build a 700xx that will do 6 rounds of oval racing, 4 rounds of MX, a 8 hour enduro plus 6 rounds of beach cross.
Having to use the 2nd chassis , as bits fell off the first one.
8 weeks away from the first race and having to build a 700xx that will do 6 rounds of oval racing, 4 rounds of MX, a 8 hour enduro plus 6 rounds of beach cross.
Having to use the 2nd chassis , as bits fell off the first one.
Stripping chassis #1