PDA

View Full Version : Honestly tell me if.....



JRP
04-01-2007, 07:58 PM
i could make a 30ft double(5ft tall, 60in wide) a 50ft double (6ft tall and 60in wide, and a 60ft step up with this dirt......

its 40ft long, and about 6ft of the middle is already taken out. also the dirt from these 2 berms....

http://i124.photobucket.com/albums/p16/jrp859/jordan15.jpg
http://i124.photobucket.com/albums/p16/jrp859/jordan4.jpg
i have another identical berm like this too...
another shot of the jump...
http://i124.photobucket.com/albums/p16/jrp859/jordan7-1.jpg

JRP
04-01-2007, 08:02 PM
also with teh step up, i already have a hill to put the landing on, so i wont need that much dirt for that...

Mxjunkie
04-01-2007, 08:07 PM
I dont think so mayne.. :bandit:

04-01-2007, 08:39 PM
if u take out the middle part and move back the landing and the ramp part where u take off, i bet with the dirt in the middle, and the burm, you could leave the middle part empty and get a 60 footer, but you would have to move your berms back, youd have no room to turn i think.

maybe im retarted? lol

CRich[814]
04-01-2007, 08:50 PM
Originally posted by mjpridered10
maybe im retarted? lol

theres no maybe about it.

just kidding.



im thinking pepper has to buy some dirte.

XCAdam89
04-01-2007, 08:53 PM
Jordan, check craigslist.org there is always free dirt in there, it's usually up in Alexandria or Crystal City though...it's free though!

AtvMxRider
04-01-2007, 09:05 PM
you need to find some old trees or old drums to bury. That way you won't need as much dirt. Old cars work good too:D

MX MaNiAc 06
04-01-2007, 09:36 PM
Deffinately not enough dirt to do that. I say u just take all the dirt n make one big double. Either a 50' double or that step up ur talking about. U also want ur jumps way wider than 60". Thats 5 inches on each side when u land. U need at least 4-5 extra feet.

JOEX
04-01-2007, 09:38 PM
I have about 15 cubic yards of dirt you can have....




















U-Haul only:chinese:

JRP
04-02-2007, 10:08 AM
yea im not to sure on how big ot make the double. i want it to be around 50 or 60ft, but i only have room for about 3rd gear tapped, so im sure that will work out.

PeasOnMyHead
04-02-2007, 10:14 AM
is that a 50 track?

XtremelyCrazy
04-02-2007, 12:46 PM
Originally posted by CRich[814]




im thinking pepper has to buy some dirte.

Buy dirt?

I'll give ya dirt for free.

(You have to pay for shipping, tho. ;) :D )

JOEX
04-02-2007, 05:53 PM
You should be able to get fill dirt for free and delivered. Excavators are often looking for places to dump dirt but make sure you ask for clean fill dirt.