View Full Version : Honestly tell me if.....
i could make a 30ft double(5ft tall, 60in wide) a 50ft double (6ft tall and 60in wide, and a 60ft step up with this dirt......
its 40ft long, and about 6ft of the middle is already taken out. also the dirt from these 2 berms....
http://i124.photobucket.com/albums/p16/jrp859/jordan15.jpg
http://i124.photobucket.com/albums/p16/jrp859/jordan4.jpg
i have another identical berm like this too...
another shot of the jump...
http://i124.photobucket.com/albums/p16/jrp859/jordan7-1.jpg
also with teh step up, i already have a hill to put the landing on, so i wont need that much dirt for that...
Mxjunkie
04-01-2007, 08:07 PM
I dont think so mayne.. :bandit:
if u take out the middle part and move back the landing and the ramp part where u take off, i bet with the dirt in the middle, and the burm, you could leave the middle part empty and get a 60 footer, but you would have to move your berms back, youd have no room to turn i think.
maybe im retarted? lol
CRich[814]
04-01-2007, 08:50 PM
Originally posted by mjpridered10
maybe im retarted? lol
theres no maybe about it.
just kidding.
im thinking pepper has to buy some dirte.
XCAdam89
04-01-2007, 08:53 PM
Jordan, check craigslist.org there is always free dirt in there, it's usually up in Alexandria or Crystal City though...it's free though!
AtvMxRider
04-01-2007, 09:05 PM
you need to find some old trees or old drums to bury. That way you won't need as much dirt. Old cars work good too:D
MX MaNiAc 06
04-01-2007, 09:36 PM
Deffinately not enough dirt to do that. I say u just take all the dirt n make one big double. Either a 50' double or that step up ur talking about. U also want ur jumps way wider than 60". Thats 5 inches on each side when u land. U need at least 4-5 extra feet.
I have about 15 cubic yards of dirt you can have....
U-Haul only:chinese:
yea im not to sure on how big ot make the double. i want it to be around 50 or 60ft, but i only have room for about 3rd gear tapped, so im sure that will work out.
PeasOnMyHead
04-02-2007, 10:14 AM
is that a 50 track?
XtremelyCrazy
04-02-2007, 12:46 PM
Originally posted by CRich[814]
im thinking pepper has to buy some dirte.
Buy dirt?
I'll give ya dirt for free.
(You have to pay for shipping, tho. ;) :D )
You should be able to get fill dirt for free and delivered. Excavators are often looking for places to dump dirt but make sure you ask for clean fill dirt.
Powered by vBulletin® Version 4.2.1 Copyright © 2025 vBulletin Solutions, Inc. All rights reserved.